Corporate Restructuring Project, St Agnes: the nine approved homes
Home/Projects/Corporate Restructuring Project

Corporate Restructuring Project

Status: CompletedSt AgnesTalk to us about a similar site

Project details

Homes
9

Corporate restructuring

The situation

A long-held site with development approval for nine homes, and an owner no longer positioned to fund or deliver construction. Holding costs were accruing, the approval had a finite life, and existing commitments narrowed the options available.

What we did

Kaizen mapped every obligation attached to the site and the entity that held it, then designed and negotiated a restructure that allowed the approved project to proceed and the owner to exit in an orderly way, with each party’s position protected at every step.

The result

An orderly exit, with the owner realising a margin 21% above the project’s original forecast.

The moving parts

No single fix would have worked. The restructure depended on resolving each of these in the right order:

  1. Existing finance and security over the site
  2. A development approval with a finite life
  3. Design and consultant agreements already in place
  4. The holding entity’s commitments and ongoing holding costs
  5. A party able to take the approved project into construction
  6. Consents, contracts and settlement sequenced to complete together

Development management

Corporate Restructuring Project, St Agnes: the nine approved homes, image 1 of 2Corporate Restructuring Project, St Agnes: covered outdoor area, image 2 of 2
Location

St Agnes

St Agnes, South Australia

View on Google Maps (opens in a new tab)

Approximate area. The exact site is not published.

Talk to us about a similar site Call